We backfilled by hand using shovels and wheelbarrows for years. Start backfilling around the outside of the walls. With normal water pressure, city water will fill an average 18 x 36 pool in about 48-72 hours. Backfilling and Formingĭay 5: Fill the pool with water using a garden hose. Place the hose from one or two shop vacs behind the liner to suck the air out and remove wrinkles. Install the liner bead into the coping starting with the shallow end corners. Lay the liner box in the pool and unfold the liner. Walk down into the pool and touch up any rough places. Installing the linerĭay 4: The vermiculite bottom should be dry enough to walk on now. You can mix material and work at your own pace. Three or four people can easily trowel the pool bottom in 4 or 5 hours. Rent a 5 cubic foot morter mixer (with rotating paddles inside the drum). You can buy portland cement locally to save on freight. We also sell pure vermiculite that can be mixed with Portland cement. Vermiculite and Cement floorĭay 3: The easiest and best floor material is premixed vermiculite and cement. Connect the PVC schedule 40 plumbing to where the pump and filter will be located. Install the Aluminum coping with the self tapping screws provided. Install the Skimmer and return fittings on the pool wall. Pull strings and hand trim the inside of the pool to prepare for the vermiculite and cement floor. Assemble the Walls, Coping, and PVC Plumbingĭay 2: Bolt together, Align, and Level the wall panels and braces. Pools can also be successfully dug with a rented skid steer loader. Look under excavating contractors, or septic tank contractors. Look in your local yellow pages, and ask around to find out who digs for the pool companies in your area. Most contractors use a backhoe to dig pools. Excavationĭay 1: Many pool companies, even well established ones, subcontract the dig to an excavation contractor. Watch the installation video several times to become familiar with the construction process. Inspect the shipment to be sure everything on the list is there and in good condition. Plan on having at least 2 people to help unload the truck. Receiving the pool kitĭepending on where you are located, the pool kit will be delivered by our driver on our truck, or delivered by one of our partnering truck lines. Obtain the required permits before starting your pool installation. Use flour or spray paint to mark the swimming pool location in your yard. The drain fill lines can be relocated if needed. Locate your septic tank and drain fill lines. Utility companies will locate power, gas, telephone and cable lines free of charge. Planning and site preparationĬall your local municipality and find out what is required as far as fencing, property line, sewer, drainage and electrical code requirements for your area. Simple tools and common sense are all that is required. All other work can be done by any average handyman using our instructional video and manual. They are: The excavator to dig the pool, The licensed electrician to wire the pump and light, and the Concrete Finishers (if you choose to pour a concrete deck). The time required to build an average pool start to finish is about 100 to 120 man hours (3 people x 40 hours). INGROUND Pool Kit Construction Overview - do it yourself What to expect
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |